★ 9 SKUs · OEM from 100 units · no commission on introductions

Wholesale & private-label catalogue

The factory specification, before you commit to tooling.

Every SKU below is a production device we can brief a factory on: the format, the real minimum order quantity, the lead time that applies, and what can actually be changed under OEM, ODM or private label. A listing here is a factory specification, not a test result — the bench-tested devices live under Reviews.

We don't sell the products we review. Ever. · Are you a brand? Put your device on our bench →

What every row tells you

Each row carries the same six facts a buyer has to settle before committing to tooling: which device it is, what it is made of, how many units the factory will run, how long production takes after sample approval, how long it runs on high, and what the ingress-protection rating is. Where a figure is not published the cell says so rather than guessing, and where the factory quotes a range the range is reproduced exactly.

The table is sorted by entry quantity so the lowest-commitment models are first. That number is the only one that decides whether a first container is possible at all — and it is the figure our MOQ pricing guide explains in cost terms: what the minimum is protecting, and the three things that move it. An embedded operations partner changes what a row means: a distributor reading this table alone is buying a product, while a team that owns the reorder calendar, the inspection booking and the freight slot is buying a schedule — and only the second reader can use the lead time as a fact rather than an estimate.

Catalogue — specification index

How OEM, ODM and private label actually work →
Factory-declared specifications for all 9 catalogue SKUs, lowest entry quantity first. 5 of 9 brief from 100 units in a standard colour; the rest from 300 units. Every figure is the factory's stated specification, not a SirenPicks bench measurement — see the disclosure below.
SKUDevice formatMaterialEntry MOQBulk lead timeDocumented runtimeProtectionFull specification
A0179triple-finger rabbit massagerFood-grade silicone100 units25–35 days45 min at highIPX6A0179 spec sheet →
A0180single-motor clitoral massagerFood-grade silicone100 units25–35 days60 min at highIPX6A0180 spec sheet →
A0182triple-stimulation rabbit massagerFood-grade silicone100 units25–35 days60 min at highIPX6A0182 spec sheet →
A0183mini wand massagerFood-grade silicone and ABS100 units25–35 days55 min at highIPX5A0183 spec sheet →
A0187slim bullet massagerFood-grade silicone and ABS100 units25–35 days55 min at highIPX5A0187 spec sheet →
A0158dual-motor personal massagerFood-grade silicone and ABS300 units25-35 days50 min at highIPX5A0158 spec sheet →
A0170dual-motor rabbit massagerFood-grade silicone and ABS300 units25-35 days40 min at highIPX5A0170 spec sheet →
A0171dual-stimulation rabbit massagerFood-grade silicone and ABS300 units25–35 days40 min at highIPX5A0171 spec sheet →
EVo-062love bunny suction massagerFull-body encapsulated silicone300 units25–35 days50 min at highDaily-use washableEVo-062 spec sheet →

9 SKUs · Body-Safe Silicone Devices · lowest entry quantity 100 units. Prices are quoted per brief rather than listed: B2B terms depend on volume, packaging and Incoterms, so a single number on this page would be wrong for almost everyone reading it.

What is stated in writing here is what a buyer can quote internally without going back to the supplier.

What each catalogue entry states in writing

Ingress / waterproof rating 9 of 9
Charge time 9 of 9
Motor specification 9 of 9
Electrical ratings 6 of 9
Battery capacity 6 of 9
Measured noise figure 6 of 9
Operating temperature range 1 of 9

3 of the 7 spec lines are published by all 9 catalogue entries; the rest are the lines a buyer has to ask for.

What each catalogue entry states in writing. Counted from the 9 product records this catalogue renders, at build time. Every entry publishes an ingress rating, a charge time and a motor specification; 6 publish a measured noise figure and 1 publishes an operating-temperature range. That unevenness is the normal state of a factory spec sheet, and it is the practical reason to ask for a per-batch test report rather than accept a brand-level certificate: the lines a supplier omits are usually the ones a marketplace or a customs authority will ask you for. Sample turnaround runs 3–5 business days before any production clock starts.

The unit price is the first of seven lines, and on a first private-label order it is usually the smallest one.

The six lines beyond the unit price on a first private-label order

Mould / tooling (private silicone shape) $500–15,000
Certification (CE + FCC + UN38.3 + ISO) $1,000–5,000
Sea freight (1,000 units) 15–20% of order
Custom FSC packaging + print $1,500–2,500
Pre-shipment inspection $300–800 / batch
Sample round $200–500

The unit price is what you negotiate; these six lines are what you actually spend before the first unit sells — tooling and certification lead, and both are one-time costs a mature supplier amortises across later runs.

The six lines beyond the unit price on a first private-label order. Illustrative planning ranges for the fixed and semi-fixed costs that sit on top of the unit price on a first private-label order (about 1,000 units), pooled from published sourcing guides for this category. A private silicone shape needs tooling from $500 for a standard block to $15,000 for complex geometry; a full CE + FCC + UN38.3 + ISO 13485 certificate pack runs $1,000–5,000; sea freight is 15–20% of order value; custom FSC-certified packaging $1,500–2,500; a pre-shipment inspection $300–800 per batch; and a sample round $200–500. Bars show a planning midpoint, not a quotation — they are the line items buyers most often omit when they compare two unit prices and pick the wrong supplier.

One SKU, several markets, a different bill in each — the reason compliance is budgeted per destination rather than per product.

What it costs to make one SKU sellable, market by market

EU — CE (LVD+EMC) + RoHS + REACH + GPSR person $2,000–6,000
US — FCC ID + 21 CFR 177.2600 material test $1,500–5,000
UK — UKCA file + packaging EPR registration $1,500–4,500
Japan — PSE + TELEC (wireless) $1,500–4,000
Australia / NZ — RCM + EESS registration $800–2,500

The EU is the most expensive market to open, and the reason is structural rather than bureaucratic: the GPSR Responsible Person is an annual cost, so the EU figure recurs every year while the test data behind it does not.

What it costs to make one SKU sellable, market by market. The market-entry cost of putting one SKU on sale in each of the five markets this catalogue ships to — a different bill from the retail-onboarding stack, paid earlier and to labs and authorised representatives rather than to a retailer. The EU leads because it needs the widest test pack (CE under LVD and EMC, RoHS, REACH) plus an established Responsible Person under the GPSR, which is an annual service rather than a one-off filing. The US needs an FCC ID for anything wireless and a material test to 21 CFR 177.2600; the UK runs its own marking and enforcement regime through OPSS, so the file is assembled separately even where the same lab data is reused — the saving is in reusing data, not in skipping the filing. Japan pairs PSE with TELEC for anything wireless; Australia and New Zealand pair RCM with EESS registration before supply. These are planning ranges compiled for this category, per model rather than per order, and a lab quote against your actual BOM is the only number that binds. Bars are a midpoint; the ranges are what you budget.

The two numbers are rarely equal, and the larger one is the one that binds the order.

Product minimum against packaging minimum

Product — lowest entry tier in the catalogue 100 units
Product — highest entry tier in the catalogue 300 units
Packaging — neutral carton, your label applied ~100 units
Packaging — printed carton run 300–500 units

The product tier in this catalogue starts at 100 units; a printed carton run typically starts at 300–500.

Product minimum against packaging minimum. Why the packaging floor, not the product floor, is usually the one that binds. In this wholesale catalogue the product entry tier runs from 100 units; adding your artwork to a neutral carton keeps the same floor, because there is no print setup to recover; a printed carton run introduces one, and that is typically 300–500 cartons whether 100 devices or 5,000 end up inside them. The practical move is to run the first batch in neutral packaging with your label applied and move to printed cartons at the reorder, once you know the SKU sells. The label that sits behind each of those floors is set out in §4.3 of the MOQ guide, and §4.5 covers what to do when the floor belongs to the material rather than to the factory.

Where every number on this page comes from, field by field

Buyers ask a fair question about a page like this: which of these values is a measurement, which is a declaration, and which one actually moves when the factory changes something. The answer is the table below. Every cell on this page is read from one named field in the SKU record, reproduced exactly as the factory wrote it — including the ranges, and including the cases where only a range is published.

Every value on this page, mapped to the field it is read from
Value on this pageField in the SKU recordHow the value is writtenWhat it does not prove
Entry quantitymoqFree text, e.g. “300 units (standard colour); 500 units (custom colour or logo)”A declared floor for a colour run, not a quotation for your packaging or your market
Manufacturing routeoem_odm“Private label from 300 · ODM from 500 · custom mould from 1,000”Which of the three routes your actual design change requires
Production lead timelead_time“Sample 3–5 business days. Bulk 25–35 days after sample approval and deposit”The bulk clock starts at sample approval and deposit, not at your purchase order
Body-contact materialmaterial“Food-grade silicone + eco-friendly ABS”A declaration. The migration test report from an accredited lab is the evidence
Ingress protectionwaterproof“IPX5 per IEC 60529 §14.2.5, 12.5 L/min at 1 m for 3 min, every batch”Rinse-safe — it is not a submersion rating and not a boil rating
Runtimeruntime“About 50 minutes at high speed”One setting. It is not a range across the seven patterns or three speeds
Noisenoise“60 dB / 30 cm”The factory’s figure at one distance. Our bench number is a separate, dated measurement
Outgoing qualityqc“IQC → IPQC → FQC → OQC, <0.1% outgoing defect rate”A process description plus a self-declared rate — ask for the per-batch report
Payment termspayment“30% T/T deposit + 70% T/T balance before shipment”The default, and the line most worth negotiating on a second order

None of the nine is a measurement we took. They are declarations the factory makes on its own sheet, and the point of publishing them field by field is that you can check one against a sample or a quotation without having to guess which sentence it came from. The measured side is separate, dated and named: what our bench recorded is in the reviews, and the protocol behind it is published in full.

It also explains why the charts on this site move. Every figure that counts devices — the material and rinse counts on the care guides, the specification-coverage bars here and on the brands page — is computed from these fields when the site is built. Add a SKU or correct a record and the chart changes on the next build, rather than staying on the page as a number nothing supports. If a value matters to your decision and the record has a dash in it, that dash is the answer: the factory does not publish it, and we would rather show the gap than fill it.

What this page is. These are OEM/ODM SKUs supplied by our manufacturing partners for wholesale and private-label briefs. A listing here is a factory specification, not a test result — bench-tested devices are published separately under our measured device reviews. SirenPicks is not the seller and takes no commission from either side of an introduction. Nothing on this page is a ranking, and no placement can be bought. Disclosure

The table above is a factory specification index, published by the SirenPicks independent review desk under the same rule as its measurements: no invented figure, no favourable rounding, and a dash where the factory does not publish one.

For the measured side — what our bench actually recorded on devices we bought — see the reviews, and for the protocol, how we test. What happens to the pallet after it lands — OTIF, the MABD date, the chargeback and the planogram — is on retail readiness, and what decides whether a second order is raised is on the second order. And when the answer at the review is that the item leaves the range, what that exit costs is on the exit — delisting, markdown and dead stock.

Not sure which SKU fits your market?

Send the category, the volume band, the target retail price and the channel. You get a shortlist ranked by the criterion your buyer actually cares about, with the measurement that decided it — usually within two working days.

Send a sourcing brief — free

Questions buyers ask before they send a brief

Can I mix several SKUs in one first order?

Yes, and a mixed model trial order is the normal way a first line is tested: several shapes at the entry quantity each, rather than one shape at a volume you have not sold yet. Two costs move when you do it. The printing setup cost is charged per artwork rather than per unit, so three SKUs means three setups even when the total unit count is unchanged — that is the line a mixed order does not escape.

And each additional SKU carries its own certification variant, because a report describes a model and a bill of materials. Mix the first order, but mix it inside one product family, so the certification file, the packaging plate and the material specification are shared rather than tripled.

Who owns the mould if I pay for the tooling?

It depends entirely on what the purchase order says, so make it say something. Paying a tooling fee buys you the amortisation, not automatically the asset; ownership, exclusivity and the right to move the mould are three separate clauses, and they are the difference between a qualification cost you can recover and one you cannot.

Model the tooling as a risk-adjusted number: if the SKU fails, what is left, and who can sell the same shape tomorrow? Capacity booking belongs in the same conversation, because a mould you own is worth little if the line is committed to somebody else in your launch quarter. All three questions are business continuity planning, and they are cheaper before the deposit than after it.

What is the minimum order quantity for these devices?

Each SKU states its own MOQ in the specification, and the entry tier varies by SKU — the lightest, simplest devices start at 100 units, the rest at 300. A custom colour, logo or Pantone match moves any SKU to 500 units, and full custom mould work starts at 1,000. The figure on the card is the factory's, not an estimate — and our MOQ pricing guide explains what that number is actually protecting.

Can I sell these under my own brand?

Yes — that is what the OEM/private-label route is for. Logo application, Pantone colour matching, retail packaging design, multilingual manuals and carton configuration are available from the SKU's stated MOQ, and units ship without factory branding unless you ask for it.

What certifications come with an order?

The documentation set is a CE Declaration of Conformity, RoHS test report, FDA 21 CFR 177.2600 material compliance, REACH statement, MSDS, commercial invoice, packing list and certificate of origin. UN38.3 battery transport certificates and IEC 62133 test reports are available on request for air and sea freight.

Are these devices bench-tested by SirenPicks?

No, and the page says so rather than implying it. These are factory specifications published for sourcing evaluation. Devices that have run our five-criteria protocol are published with their measurements under Reviews, and a catalogue listing is never presented as a test result.

Do you take a commission on an introduction?

No. We take no commission from either side of a manufacturing introduction, which is the only way the introduction means anything. Where a fee applies it covers the sourcing work and the written shortlist.

How do I negotiate a lower MOQ?

Three things move the number, and none of them is asking nicely. A written volume ramp — first order small, second and third committed — changes the factory's risk calculation. An itemised cost breakdown shows which costs are fixed. And narrowing customisation scope lowers the setup cost the MOQ has to recover. Our MOQ pricing guide walks through each one.

How do I start an intimate wellness brand?

Pick one hero SKU, validate demand on a small first order, then scale. Our guide to starting an intimate wellness brand covers the market work, the compliance order, the supplier checklist and realistic startup-cost scenarios.

How can I tell a factory from a trading company?

Ask for a live, unscripted video walkthrough of production running that week — raw material storage, the assembly line, the QC station. Cross-reference the business licence against the physical address, and request the CE/RoHS reports with the accredited lab's name and sample ID. A direct manufacturer can do all three; a trading company usually cannot.

What is the difference between a public tool and a private tool?

A public tool is a mould the factory already owns and runs for several brands — you add your logo, colour and packaging to an existing shape, and there is no new tooling cost to recover. A private tool is cut for you, paid for by you, and held under contract so it is not resold to your competitors. Public tools carry the lower minimum; private tools are what you buy once a shape has proved itself and you need to stop competitors selling it. Our MOQ pricing guide compares the two routes line by line.

How much does a custom mould cost?

A standard platinum-cure silicone shape typically runs $500–$3,000, and complex geometry can reach $2,000–$15,000. The figure matters less than the ownership terms: ask whether the fee is itemised, who owns the tool, and what happens if you move factories. A tooling fee charged on a shape the factory is already running for other brands is not a mould — it is margin with a technical name.

Do these devices meet ISO 3533:2021?

Ask the supplier directly and ask to see how, because this is the one question that sorts factories that know the product class from factories that only know their catalogue. ISO 3533:2021 is the international standard covering sex toys in direct contact with the genitalia, the anus or both, published in September 2021. It requires documented risk assessment, retention-safe design for anal-use products, freedom from burrs and sharp edges, and post-market surveillance — a design discipline, not a certificate bought once.

What is UN38.3, and do I need it?

Yes, if you are shipping by air, which most first orders do. UN38.3 is a set of lithium-battery transport tests — altitude, thermal cycling, vibration, shock, short circuit, overcharge — and couriers will not fly a rechargeable device without it. It is the certificate most often discovered too late: founders clear CE, then find the shipment held at origin because nobody tested the cell.

What payment terms are normal on a first order?

Thirty per cent on the purchase order, seventy per cent against a passed pre-shipment inspection. Never 100% up front, whatever the reason given — the split is not only cash flow, it is the reason the balance depends on goods that pass. Treat any first-order demand above 50% as a signal to slow down and verify the supplier.

Can I get samples before committing to the MOQ?

Yes, and you should treat them as the only moment you inspect the product before it is a container of your money. Samples from a stock platform usually arrive in three to five working days. Test the sample the way a customer will: material feel, noise held in the hand, charging and battery, and whether the packaging is something you would put your name on.

What AQL level should I ask for, and can I use my own inspector?

Ask for the AQL in writing and ask whether a third-party inspector is accepted — both answers tell you more than the level itself. AQL 2.5 is the usual commercial standard, 1.5 where you are positioning as premium. A supplier who will only accept its own inspection report, or who goes vague on defect handling, has answered the question you did not ask.

Can I use my own mould, or an existing design?

Both are possible. If you already own tooling, the question is whether the factory will run it and under what exclusivity terms, and you should get the answer in writing before a deposit. If you are bringing a design, expect the sampling leg to lengthen because the tool has to be proved before it can be scheduled. In either case, establish who owns the tool and what happens to it if the relationship ends.

Can I ask for a destruction-test sample before I commit?

Yes, and asking for one tells the factory what kind of buyer you are. A stock sample shows how the device feels; a sample you cut open shows whether the core, the motor mount, the cell and the seam are what the spec sheet claims — and the seam is where a cheap unit fails first. Suppliers who expect professional buyers quote a destruction-test sample without hesitating; a supplier who stalls on a paid sample has answered a more useful question than any certificate could. Our sourcing guide covers what to photograph before you cut.

Do you offer Net-30 or open-account terms?

Not on a first order, and a verified supplier should not. Net-30, Net-60 and partial consignment are second-order terms: they are earned by a clean first shipment that landed to specification. On a first order the workable structure is a deposit against production and the balance against inspection or shipping documents — 30/70 is the convention in this category, and 20% is commonly negotiated when the buyer is paying for the tooling. Once a shipment lands to spec, a smaller repeat on Net-30 is a normal conversation, because the track record is the collateral.

Which categories do the nine rows cover, and what can I ask for that is not a row?

All nine are body-safe silicone massagers — four rabbit bodies, a dual-motor, a clitoral massager, a mini wand, a bullet and a suction massager — because a row on this page is a promise that we hold a specification sheet and have checked every field in it. The categories buyers ask for most beyond this index are app-controlled wearable massagers, kegel-ball trainers, pelvic massagers and prostate devices.

Those are quoted on a brief rather than listed as rows, and the distinction is honest rather than commercial: the same mould-and-MOQ logic applies, but we have not verified a specification sheet for them, and a row whose fields are mostly dashes is worse than no row at all. Send the category with a volume band and a target retail price and you get the same treatment as a listed SKU — a shortlist and the numbers behind it. What a row means field by field is explained under data provenance.

Read across the two groups rather than down the column: the split is at 100 and 300, and it follows the tooling route.

Where the entry minimum sits, across the catalogue

100 units — 5 SKUs 100 units
300 units — 4 SKUs 300 units

The catalogue splits into two entry tiers — 100 units and 300 units — and the tier follows the tooling, not the specs.

Where the entry minimum sits, across the catalogue. The factory minimum order quantity for each SKU on this page, grouped by tier, taken from the same catalogue records the SKU pages render. Every SKU also has a second, higher step for a custom colour or logo (typically 500 units): the number above is what a first order is priced against. These are factory minimums for a private-label run, not distributor minimums — a wholesaler reselling these will quote a smaller number at a higher unit cost.

Every entry in the specification table sits on one of these routes, and the route is what the minimum is really paying for.

The tooling route sets the minimum, not the product

Private label on an existing mould 300 units
ODM modified design 500 units
Full custom mould 1,000 units

Going from a private-label run to a full custom mould multiplies the minimum by 3× — which is the real cost of wanting a shape nobody else has.

The tooling route sets the minimum, not the product. The three sourcing routes every SKU in this catalogue supports, with the minimum each one carries, read from the same product records the SKU pages publish. A private label applies your brand to a mould the factory already owns, so the minimum is set by the production run. A modified design changes the tooling, and a full custom mould amortises new tooling across the order — the same arithmetic that makes a minimum order quantity exist in the first place. Sample turnaround (3–5 business days) runs before any of these clocks.

Catálogo y guías, también en español

SirenPicks en español Guías para marcas Reseñas medidas Selecciones por necesidad

Reading a specification index before you brief anyone

Work with our lab →

Buyers arrive at wholesale intimate wellness devices from two directions: teams building a line from nothing, who need a low MOQ adult toy supplier for a first run, and established ranges adding a form factor. The page serves both, which is why each row states what is declared and what that claim lets you do — how contract manufacturing actually runs sets the same tiers out against the tooling that explains them.

A specification is a promise about production and a measurement is a result about a unit someone bought; product engineering keeps the two apart for an operational reason — the spec fixes the design space and the test says whether the shipped unit fell inside it [Ulrich, 2020] — which is also why we publish the supplier scorecard rather than a brochure [Christopher, 2016].

One term from the factory side of this category is worth having before you ask for a quote: a surface finish sample is the physical piece a factory sends to agree what the mould surface should look like — matte, gloss, textured — rather than a description in an email. Agree it in your hand, photograph it under the same light, and reference it in the brief, because "matte" survives translation badly.

Sources cited

  • 《Elastomer》 — Wikipedia. https://en.wikipedia.org/wiki/Elastomer
  • Ulrich, Karl T.; Eppinger, Steven D. (2020). Product Design and Development (7th ed.). McGraw-Hill Education, New York.
  • Christopher, Martin (2016). Logistics & Supply Chain Management (5th ed.). Pearson Education, Harlow.